Key Concepts
- Field Assignments: Temporary relocation to a construction site for hands-on experience.
- Constructability: Designing with ease of construction and long-term maintenance in mind.
- Commissioning: Validating that installed systems operate appropriately.
- Progressive Design-Build: A project delivery method where the design and construction teams work collaboratively from the outset.
- Communication: Key to resolving issues and building relationships with contractors and design teams.
- PDM (Payment Per Diem): A lump sum payment for travel and expenses during a field assignment.
- MGD (Million Gallons per Day): A unit of measurement for water treatment plant capacity.
- RFI (Request for Information): A formal request from a contractor to the design team for clarification or additional information.
- Engineering Change Notice: A formal notification of a change to the design or specifications of a project.
Benefits of Field Assignments
- On-the-Job Experience: Direct observation of real construction progress.
- Improved Decision-Making: Understanding how designs are constructed and maintained.
- Enhanced Design Coordination: Identifying what's important for contractors to see on drawings.
- Long-Term Maintenance Considerations: Designing for accessibility and ease of maintenance.
- Understanding the Project Lifecycle: Seeing the project from design to implementation.
- Constructability Focus: Designing with ease of construction in mind.
- Communication Skills: Building relationships with contractors and design teams.
Challenges of Field Assignments
- Remote Living: Relocating to a construction site and maintaining two residences.
- Loneliness: Being away from family and friends for extended periods.
- Maintaining Two Residences: Managing expenses and logistics for two living situations.
- Project Variety: Working on a single project for an extended period can be overwhelming for some.
- Technical Challenges: Overcoming obstacles such as water supply limitations during commissioning.
Wichita Northwest Water Facility Project: A Case Study
- Scale: A $500 million mega-project, the largest infrastructure project in Wichita's history.
- Purpose: To replace an 80-year-old facility and provide water for 20% of Kansas.
- Capacity: 120 million gallons per day (MGD).
- Size: The filter building is as big as several football fields, with clarifiers having an inner diameter of 141 feet and pipes up to 96 inches in diameter.
- Mariah's Role: Lead process field engineer, coordinating with contractors, involved in commissioning and startup planning.
- Challenges: Obtaining enough water to test the plant due to drought conditions.
- Solution: Collaborating with the city to create a loop around the new facility and testing individual trains at lower flow rates.
Logistical Considerations for Field Assignments
- Transitioning Off Current Assignments: Transferring responsibilities to other team members.
- Re-Integration: Planning how to get back into the group upon return.
- Living Situation: Deciding on furnished vs. unfurnished accommodations.
- Home Maintenance: Arranging for yard maintenance or cleaning services.
- Compensation: Considering PDM and travel benefits.
Steps to Position Yourself for Field Assignments
- Technical Expertise: Focus on learning as much as possible in your technical specialty.
- Communication: Develop strong communication skills.
- Express Interest: Make it clear to supervisors and project managers that you're interested in fieldwork.
- Internal Interest Forms: Fill out internal interest forms for field assignments.
- Humility: Be open to learning from others on site.
Common Misconceptions About Field Work
- Always Outside: There's still a significant amount of office work involved.
- Working Alone: There's a lot of support available if you're willing to accept it.
Advice for Civil Engineers Considering Field Assignments
- Take Advantage of Opportunities: If you can swing it personally, take advantage of any field assignment that comes your way.
- Long-Term Impact: Field experience will position you to lead future design efforts and potentially move into the construction market.
- Communication is Key: "You can have the best idea but if you're not able to communicate it uh in a way that the contractor is receptive to that it's just a wasted idea."
- Be Humble: "Being humble and understanding that you don't you don't know everything and you're really like open to learning from those on site... is really important."
CE Hot Seat Segment
- Daily Rituals: Scheduling a walk during lunch and setting a reminder to leave work.
- Book Recommendation: Finish by John Auff, which emphasizes flexibility in accomplishing goals.
- Qualities of a Favorite Manager: Technical expertise and investment in staff.
- Career Advice: Explore different industries and phases of project delivery to find where you get the most fulfillment, then focus on developing your leadership and technical skills in that area.
Synthesis/Conclusion
Field assignments are invaluable for civil engineers, providing practical experience, improving design coordination, and fostering communication skills. While challenges such as remote living and project variety exist, the long-term benefits of field experience outweigh the difficulties. By focusing on technical expertise, communication, and a willingness to learn, civil engineers can position themselves for successful field assignments and accelerate their career growth. The Wichita Northwest Water Facility project serves as a compelling case study, highlighting the complexities and rewards of working on a large-scale infrastructure project. Ultimately, taking advantage of field assignments is a strategic move for civil engineers seeking to become well-rounded professionals and leaders in their field.