Thủ tướng chỉ đạo tập trung cao nhất ứng phó mưa lũ ở miền Trung | VTV24
By VTV24
Key Concepts
- Thiên tai, mưa lũ miền Trung: Natural disaster, heavy rain and floods in Central Vietnam.
- Ứng phó, khắc phục hậu quả: Response and mitigation of consequences.
- Sạt lở: Landslide.
- Lương khô: Dry rations.
- Cung cấp điện, sóng viễn thông: Electricity and telecommunication services.
- Phòng chống dịch bệnh: Disease prevention.
- Cao tốc La Sơn - Hòa Liên: La Son - Hoa Lien Expressway.
- Ta luy dương: Embankment slope.
- Thông suất giao thông: Traffic flow.
Summary of Urgent Meeting on Central Vietnam Floods and Landslides
1. Overview of the Situation and Government Response
On the morning of [Date of broadcast], Prime Minister Phạm Minh Chính chaired an urgent online meeting with several central provinces to address the response and mitigation efforts for natural disasters, specifically heavy rains and floods. According to the National Civil Defense Steering Committee, as of this morning, nine people have died and five are missing due to the floods in the Central region.
Prime Minister Chính characterized this as an exceptionally severe flood event in Central Vietnam, with unprecedented rainfall in many areas. The Prime Minister has issued three directives, with Deputy Prime Minister Trần Hồng Hà leading meetings with ministries, sectors, and localities, and personally inspecting and directing flood response efforts.
2. Prime Minister's Directives and Key Actions
The Prime Minister issued several critical directives:
- Immediate Support for Affected Populations:
- Timely visit, encouragement, and provision of the best possible support policies for citizens, especially families of those who died or are missing.
- Urgent rescue and treatment of the injured.
- Decisive evacuation of people from dangerous areas.
- Ensuring the supply of food, essential goods, clean water, and disinfectant by all means.
- Specific Aid: The central government will immediately provide 2 tons of dry rations to Huế City. Quân khu 5 (Military Region 5) is to expedite transportation of these supplies to the people.
- Mobilization of Resources:
- Military and police forces are to urgently supply residents in deeply flooded and isolated areas.
- Mobilize additional vehicles for disaster prevention and control.
- Restoration of Essential Services:
- The Ministry of Industry and Trade and the Ministry of Science and Technology are to direct corporations to urgently restore electricity and telecommunication services as soon as possible, ensuring timely and complete information for the public.
- Post-Flood Recovery Plan:
- Develop plans for consequence mitigation and recovery of activities immediately after the floodwaters recede.
- Prioritize schools and healthcare facilities for restoration.
- Prepare forces, vehicles, and supplies for sanitation, road repair, environmental treatment, disease prevention, and production recovery.
- Financial and Material Support:
- Ministry of Finance: To immediately allocate 150 billion VND to support Huế City, 100 billion VND to Quảng Ngãi province, and 100 billion VND to Quảng Trị province.
- To promptly address requests for goods from national reserves.
- Reporting and Information:
- Ministries, sectors, and localities are to urgently compile, synthesize, and update preliminary damage assessments and report immediately to the Politburo, the Secretariat, and competent authorities.
3. Deputy Prime Minister's Inspection and Directives on Expressway Landslides
On the same morning, Deputy Prime Minister Trần Hồng Hà, Standing Deputy Head of the National Civil Defense Steering Committee, personally inspected the response to severe landslides on the La Sơn - Hòa Liên Expressway, which passes through Huế City.
- Landslide Situation: Numerous sections of the expressway's embankments (ta luy dương) have experienced significant landslides, with large volumes of soil and rock blocking the road, causing traffic congestion and posing a risk to safety.
- Deputy Prime Minister's Directives:
- Ministries and localities are to cordon off and block affected areas, implement emergency traffic diversions.
- Immediately mobilize machinery and personnel for repairs to ensure safe and smooth traffic flow.
- Highest Priority: Ensuring the safety of people's lives and maintaining the flow of vital transportation routes.
- Huế City People's Committee: To closely coordinate with relevant agencies to strictly monitor areas with landslide risks, especially at mountain passes, high embankments, and submerged crossings.
- Infrastructure Assessment: Given the forecast of high-intensity rainfall, functional forces are to immediately inspect the condition of telecommunication, electricity, and urban transport infrastructure. Efforts should be made to ensure communication, power supply, and support for people in deeply flooded areas during emergencies.
4. On-the-Ground Efforts and Challenges
- Expressway Repairs: Despite unfavorable weather conditions overnight, construction units on the La Sơn - Hòa Liên Expressway are working urgently to clear the route. Similar efforts are underway on other vital routes in various localities.
- Mobilization: Forces have been mobilized overnight and today to clear soil and rock, with personnel on standby. One specific location reported nearly 1,000 cubic meters of soil blocking the road, with immediate efforts to clear accessible areas.
- Widespread Flooding and Landslides: For two days, floodwaters have inundated many national highways from the plains to the mountainous regions, including National Highway 1A. Key routes through Đà Nẵng City are either flooded or have experienced landslides.
- Remaining Accessible Routes: Currently, only the coastal road and the Đà Nẵng - Quảng Ngãi Expressway remain unaffected by flooding, allowing for some traffic.
- Traffic Management: Traffic is described as difficult and dangerous. Drivers are attempting to navigate to secure food and accommodation. All vehicles are being diverted to expressways or other safe routes.
- Traffic Control Points: Forces are stationed at all flooded and landslide-affected points, coordinating with local police to ensure safety.
- Ho Chi Minh Road Forecast: Traffic on the Ho Chi Minh Road is not expected to resume today due to new landslide points. Clearing the accumulated soil and rock will require significant time and specialized machinery.
5. Synthesis and Conclusion
The urgent meeting chaired by Prime Minister Phạm Minh Chính highlights the severe impact of recent heavy rains and floods in Central Vietnam, resulting in significant loss of life and widespread damage. The government is mobilizing resources at all levels, from immediate humanitarian aid and evacuation to long-term recovery plans. Deputy Prime Minister Trần Hồng Hà's direct involvement in inspecting critical infrastructure like the La Sơn - Hòa Liên Expressway underscores the urgency of restoring essential services and ensuring public safety. The ongoing efforts to clear landslides and manage traffic amidst challenging conditions demonstrate the dedication of rescue and construction teams. The situation remains critical, with continued rainfall posing further risks and requiring sustained, coordinated efforts from all relevant authorities.
Chat with this Video
AI-PoweredHi! I can answer questions about this video "Thủ tướng chỉ đạo tập trung cao nhất ứng phó mưa lũ ở miền Trung | VTV24". What would you like to know?