[4K] Watch the last Starship Version 2 launch // #Flight11
By Everyday Astronaut
Key Concepts
- Starship Flight 11 (S38/B15-2): The penultimate flight of Starship/Super Heavy Version 2 (V2), focusing on data collection and pushing re-entry limits.
- Starship Version 3 (V3): The next generation of Starship/Super Heavy, featuring significant design changes, integrated hot staging, three larger grid fins, and Raptor 3 engines.
- Raptor 3 Engine: A radically redesigned, higher-thrust engine with dramatically reduced parts and integrated control mechanisms, intended for V3 Starship.
- Hot Staging: A stage separation technique where the upper stage engines ignite while still attached to the booster, enabling faster and more efficient separation.
- Suborbital Trajectory: A flight path that reaches space but does not achieve sufficient horizontal velocity to complete a full orbit, ensuring re-entry.
- Orbital Refueling: The process of transferring propellant between Starships in orbit, a critical capability for lunar and Martian missions.
- Heat Shield Tiles: Ceramic tiles protecting Starship during re-entry, with ongoing testing of durability and "crunch wrap" modifications.
- Astro Awards: An annual event hosted by Everyday Astronaut to celebrate achievements in the space industry, bringing professionals and the public together.
- Starlink: SpaceX's satellite internet constellation, used for real-time data transmission and live views during Starship flights.
- Aerostat: A tethered, unpowered lighter-than-air aircraft used by Border Patrol for surveillance.
- Delta V: A measure of the change in velocity required to perform a maneuver in space.
- Mock Diamonds (Shock Diamonds): Visible patterns in rocket exhaust plumes caused by supersonic flow interacting with atmospheric pressure.
- ISRU (In-Situ Resource Utilization): The process of extracting and utilizing resources found on other celestial bodies, such as water from lunar regolith.
Starship Flight 11: Overview and Objectives
Starship Flight 11, featuring Super Heavy Booster 15-2 (B15-2) and Starship 38 (S38), marked the second reuse of a Super Heavy booster and was the final launch of the Version 2 (V2) Starship and Super Heavy vehicles. The launch occurred on October 13, 2025, at 6:23 PM Central Time (23:23 UTC). This flight was largely a re-flight of Flight 10, with a primary focus on data collection and pushing the operational limits of the V2 hardware before transitioning to V3.
Key Flight Details:
- Liftoff Time: 6:23 PM Central Time (23:23 UTC).
- Booster (B15-2): This was its second flight, having previously flown on Flight 8 (March 6th). 24 of its 33 Raptor engines were reused.
- Starship (S38): This was its first flight.
- Payload: A dummy set of Starlink satellites, deployed on a suborbital trajectory.
- Trajectory: Both booster and ship followed suborbital trajectories, with planned splashdowns in the Gulf of Mexico (booster) and the Indian Ocean (ship).
- Raptor Relight: Starship performed a successful relight of one Raptor engine in space, demonstrating a critical capability for future orbital missions and de-orbit burns. This was the third successful relight in a row.
- Heat Shield Testing: The ship's heat shield was intentionally modified with missing tiles, including some in high-heating areas with no backup protection, to test resilience and gather data on extreme re-entry conditions.
- Re-entry Maneuvers: Starship performed dynamic banking maneuvers during re-entry, simulating the path for a return-to-launch-site (RTLS) and tower catch on future missions. This included an aggressive final turn to position itself for a simulated landing.
- Booster Landing Demonstration: The booster executed a V3-style landing burn demonstration, igniting 13 engines, then throttling down to five, and finally three, to test a new landing procedure for V3 that incorporates redundancy for engine failures.
- Pad 1 Retirement: This was the last launch from Pad 1 in its current configuration, as it will undergo major modifications for V3 operations.
Starship Version 3 (V3) and Future Plans
The transition to Starship V3 represents a significant leap in design and capability, incorporating lessons learned from the 11 V2 flight tests.
Key V3 Upgrades:
- Integrated Hot Stage Ring: The hot stage ring, currently a single-use component, will be integrated directly into the V3 booster's forward end, making the booster fully reusable.
- Redesigned Fuel Transfer Tube: A larger fuel transfer tube (comparable in size to a Falcon 9 first stage) for faster, more reliable propellant transfer and simultaneous engine startup.
- Grid Fins: Reduced from four to three, but 50% larger and stronger, with re-clocked positions to align with the catch arms and new catch points for vehicle lift and catch.
- Raptor 3 Engines: Higher thrust, dramatically reduced parts count, and integrated control mechanisms. The first flight engines are already in production and undergoing acceptance testing for Flight 12.
- Ship Overhaul: Major design changes to the propulsion system to accommodate Raptor 3, energy storage upgrades, and avionics changes for longer-duration missions.
- Docking Adapters: New external docking adapters for on-orbit propellant transfer between Starships, a core capability to be demonstrated next year.
- Pad 2: The next generation of Starship will launch from Pad 2, which is nearing completion and features a more traditional orbital launch mount, a new flame trench system, and upgraded chopsticks.
Future Milestones:
- Flight 12: Expected to be the first launch of V3 hardware (booster and ship), likely a suborbital shakedown flight with no booster catch, to validate vehicle performance.
- Orbital Missions: After validation, V3 is expected to achieve orbital missions, deploy V3 Starlink satellites, and perform return-to-launch-site (RTLS) catches.
- Orbital Refueling: A critical step for lunar and Martian missions, involving propellant transfer between Starships in orbit. This is a major bottleneck and is not expected to be fully operational by late 2026.
- Lunar and Martian Missions: Starship is designed to land humans on the Moon for the Artemis program and eventually on Mars. Tim Dodd expresses skepticism about Starship being ready for Artemis 3 moon landing by 2027, citing the complexity of orbital refueling and rapid reusability.
Starlink and Data Collection
Starlink plays a crucial role in Starship development and operations.
- Real-time Data: Four Starlink terminals on Starship provide real-time HD video and telemetry data throughout all flight phases, including re-entry through plasma.
- Milestones: Starlink has achieved over 300 launches and serves over 7 million active customers in 150 countries.
- V3 Starlink Satellites: The larger V3 satellites, to be deployed by Starship, will provide 60 terabits per second of downlink capacity, 20 times more than V2 mini launches on Falcon 9.
- Direct-to-Cell: SpaceX is developing direct-to-cell satellites to provide broadband service to cell phones globally, aiming to eliminate mobile dead zones.
- Heat Shield Tile Production: A fully automated "bakery" at Cape Canaveral produces about 1,000 heat shield tiles per day, with a target of 7,000 tiles per day (enough for 10 ships per month) to support rapid reusability.
- "Crunch Wrap" Tiles: A modification involving Vulcan felt wrapped around tiles to fill gaps, preventing plasma seepage and high heating on the underlying metal.
The Astro Awards
The Everyday Astronaut hosts the annual Astro Awards, a unique event designed to bridge the gap between space professionals and the public.
- Dates & Location: January 17th and 18th in Austin, Texas.
- Purpose: To celebrate the most exciting, inspirational, important, and innovative missions of the prior year (the "three I's").
- Format: Includes an awards ceremony, panels, speeches, and keynotes from industry leaders, astronauts (e.g., Charlie Duke in the past), and content creators.
- Community Focus: Unlike industry-focused conferences, Astro Awards aims to foster community, networking, and excitement among enthusiasts and professionals.
- Ticket Tiers: Apogee tickets (limited) offer an intimate dinner with speakers and award recipients; Orbital tickets include panels and a Saturday night party.
- Accessibility: Chosen for its downtown Austin location, offering walkability to restaurants and hotels, enhancing the attendee experience.
Perspectives on Space Exploration and Funding
Tim Dodd shared his perspectives on the future of space exploration, particularly regarding the roles of private companies and government agencies.
- Private vs. Public Sector: Dodd argues that the private sector has "solved" launch and propulsion, making reusable spaceflight cheaper and more reliable (e.g., Falcon 9 flying over 30 times). He believes government funding should prioritize science and exploration that lack a direct return on investment (ROI) for private companies (e.g., deep space probes, Earth observation, asteroid defense).
- NASA Budget Cuts: He strongly opposes proposed 47% cuts to NASA's science budget, highlighting the risk of turning off active missions and the critical reliance of sectors like farming on Earth-facing satellite data for weather, yields, and topography.
- Starship's Ambition: While acknowledging Starship's "impossible" and "game-changing" potential, Dodd emphasizes the long list of milestones (orbital flight, rapid reuse, orbital refueling) required before it can fulfill its lunar and Martian goals. He suggests a less ambitious "stepping stone" approach for NASA's near-term lunar goals while Starship matures.
- Learning and Accessibility: The "Everyday Astronaut" philosophy is about making complex space topics accessible to everyone, demonstrating that self-taught individuals can understand and engage with rocket science.
Conclusion
Starship Flight 11 successfully concluded the V2 flight test program, providing invaluable data on heat shield performance and re-entry dynamics, even with intentionally missing tiles. The flight demonstrated the robustness of the Starship design and the successful deployment of Starlink simulators, along with a critical Raptor engine relight. The focus now shifts to the highly anticipated V3 Starship and Super Heavy, which promise significant upgrades and are expected to pave the way for orbital missions, rapid reusability, and eventually, human missions to the Moon and Mars, albeit on a timeline that Tim Dodd suggests will be longer than some official projections. The broadcast also highlighted the community-building efforts of the Astro Awards and Tim Dodd's advocacy for robust government funding for space science and exploration.
Chat with this Video
AI-PoweredLoad the transcript when you're ready to chat so the initial page stays lighter.
Related Videos

SpaceX board member Antonio Gracias: I plan on holding my stake for as long as I can
CNBC Television

Watch The Moment Elon Musk Becomes World's First Trillionaire As SpaceX Has Biggest IPO In History
Forbes

PBS News Hour full episode, June 9, 2026
PBS NewsHour

'CRITICALLY NEEDS BEIJING': Chang reveals the BRUTAL reality behind Kim Jong Un’s power
Fox Business

‘Big Short’ investor Steve Eisman: I'm 'not a fan' of the upcoming SpaceX IPO
CNBC Television

Lockheed Martin, Deloitte & Applied Minds On The Future of Space And AI
Forbes

Your SpaceX IPO Questions, Answered
ARK Invest